top of page

Biography and Professional Samples

This is a section to show samples and templates of the professional applications that have been performed to date. It will be a multi-level section with additional levels introduced over time.
PERT/CPM&Bio
​

1979 TECHNOLOGY UPDATE AND 2017 CV AND LIST OF PROJECTS

INTER-DISCIPLINARY PLANNING PROCESS AND COLLABORATION OUTLINE

DETAILED EIR ENTITLEMENT PROCESS

TWO SAMPLES OF EARLY CHARTS SHOWING THE NOT TO SCALE AND TIME SCALED FORMATS

GENERIC DESIGN PROCESS

THREE VERSIONS OF A DESCRIPTION OF THE “MANAGEMENT PROCESS”

TECHNICAL SCHEDULING WORKSHOP (SAVE YOUR MONEY .... READ THE

POWERPOINT SLIDES ..)

Computers
(Information Management )

DESIGN / IMPLEMENTATION OF PROGRAM FOR SYSTEM CONTROLS – 1992 LONDON, U.K.

AN OVERVIEW OF THE CONSTRUCTION MANAGEMENT PROCESS

SAMPLE SHELL AND CORE CONSTRUCTION SCHEDULE WITH SUBMITTALS, PROCUREMENT, AND ACTIVITIES (WITH COMMENTS)

SAMPLE TENANT IMPROVEMENT SCHEDULE WITH SUBMITTAL, PROCUREMENT AND ACTIVITIES

SAMPLE MULTI-FAMILY SCHEDULE WITH LOWER CONCRETE GARAGE AND FIVE STORY CONSTRUCTION

SAMPLE FORENSIC SCHEDULE ANALYSIS AND PRESENTATION

AN EARLY CHART IDENTIFYING DOCUMENT CONTROLS SYSTEMS REQUIRED FOR RECORD-KEEPING

Litigation
(CNP vs CCA)

ORIGINAL SCHEDULE DOCUMENTS FROM PRECEDENT SETTING LITIGATION: TOTAL COST RECOVERY AND ABANDONMENT OF CONTRACT

INTERESTING COMPARISON OF AS- PLANNED, DELAY AND AS-BUILT SCHEDULES – 1978 KARL F. ELLIOTT

bottom of page